Requirements
1.
Request for appraisal and approval for fire prevention and fighting (original)
prepared by investor/company. There is no suggested form/template
2.
Authenticated copy of investment certificate***
or
Authenticated copy of planning certificate
or
Authenticated copy of signed land lease contract
or
Authenticated copy of land use right certificate
3.
FPF design profile (3 original )
This has been required to include the contents of fire prevention and fighting, its associated drawings, and explanation notes of such drawings, specifically the contents including but not limited to: locations for project construction; fire-resistance degree or extent of project; solutions to put on the fire and combat fire spreading; manufacturing technologies, electric systems, lightning-arresting system, and anti-explosion systems of project; fire escape system; traffic systems, parking lots in service of the operations of motorized fire-fighting means/vehicles; system of water supply for fire-fighting; fire-alarming system, fire-fighting system and other fire-fighting means; and estimates of funding for fire prevention and fighting project items. The profile includes drawings and explanation for such drawings.
4.
Power of attorney (original)
This is required in case where the applicant is not the legal representative of company.
Legal documents of FPF consulting entity
1.
Enterprise/Business registrationcertificate (an authentic copy)
2.
Certificate of fire prevention and fighting consulting (an authentic copy)
provided by the consulting company demonstrating that the Chief architect, Director/Deputy Director of consulting company have adequate capability of conducting construction design as required by existing laws and provisions. Alternatively they must hold bachelor or higher degree(s) on fire prevention and fighting; Those architect(s) who have directly designed technical design(s) and directly drawn construction drawing(s) of fire prevention and fighting should hold at least university education background in the related professions which are appropriate with the designing and drawing responsibilities that s/he has assumed.
Time frame
Attention at counter:
Min. 10mn - Max. 20mn
Waiting time until next step:
Min. 5 days - Max. 7 days
Legal justification
1.
Decree No. 79/2014/ND-CP of July 31, 2014 on detailing the implementation of a number of articles of the Law on fire prevention and fighting
Article 15
2.
Decision No. 41/2012/QD-UBND Regulation on “one stop service” administrative procedure settlement on direct investment projects at Vinh Phuc Investment Promotion Agency
Article 16
Additional information
Any document in foreign languages must be enclosed with the Vietnamese translation. The company must be responsible for the accuracy of such translation.